Nepal-Tibet flash flood: Two workers pulled alive from hydropower tunnel nine days after disaster

Officials said the workers were safely rescued from tunnels that were at a depth of 170 metres

Nepal-Tibet flash flood: Two workers pulled alive from hydropower tunnel nine days after disaster

TL;DR

  • Two workers, Sanjay Shah and Kabir Maharjan, were rescued alive from the Trishuli 3A hydropower tunnel in Nepal.
  • They were trapped for nine days following deadly flash floods triggered by a melting glacier.
  • The workers were rescued from a depth of 170 meters inside the tunnel.
  • Both rescued workers are in stable condition and have been transported to a hospital in Kathmandu.
  • Officials are hopeful for the rescue of more individuals trapped in tunnels at various hydropower projects.
  • The floods destroyed most hydropower projects along the Bhote Koshi and Trishuli rivers, with over 1,259 people killed and 5,000 missing.
  • Rescue efforts are focusing on hydropower tunnels, with the belief that air pockets may have allowed survivors to stay alive.